{
  "url": "http://bayareacitydweller.com/faq/how-long-does-it-take-to-install-new-insulated-windows",
  "name": "How long does it take to install new insulated windows?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "How long does it take to install new insulated windows?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "The time required to install new insulated windows depends on the number and type of windows, as well as the complexity of the installation. On average, a professional team can typically install 3-5 standard-sized windows per day. A full house with 10-15 windows might take 2-3 days. This includes removing old windows, preparing the opening, installing the new units, sealing, and finishing. Larger or custom windows may require more time. We prioritize efficient installation to minimize inconvenience.",
        "@type": "Answer",
        "description": "Installation time varies, but typically 3-5 windows can be installed per day, meaning a full house might take 2-3 days."
      }
    }
  ],
  "description": "Installation time varies, but typically 3-5 windows can be installed per day, meaning a full house might take 2-3 days."
}