{
  "url": "http://bayareacitydweller.com/faq/what-happens-after-the-framing-for-a-bathroom-addition-is-complete",
  "name": "What happens after the framing for a bathroom addition is complete?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "What happens after the framing for a bathroom addition is complete?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "Once the framing for your bathroom addition is complete and inspected, the next phases of construction begin. This typically involves rough-ins for plumbing and electrical systems, where pipes, wires, and ductwork are installed within the newly framed walls and ceiling. Following these installations, insulation is added, and then the walls and ceiling are covered with drywall. These steps prepare the space for finish materials like paint, flooring, fixtures, and cabinetry, gradually transforming the framed structure into a functional bathroom.",
        "@type": "Answer",
        "description": "After framing, the next steps include plumbing and electrical rough-ins, insulation, and then drywall installation. This prepares the space for final finishes and fixtures."
      }
    }
  ],
  "description": "After framing, the next steps include plumbing and electrical rough-ins, insulation, and then drywall installation. This prepares the space for final finishes a"
}