{
  "url": "http://bayareacitydweller.com/faq/when-should-bathroom-trim-be-installed-during-a-renovation",
  "name": "When should bathroom trim be installed during a renovation?",
  "@type": "FAQPage",
  "@context": "https://schema.org",
  "speakable": {
    "@type": "SpeakableSpecification",
    "cssSelector": [
      "h1",
      ".faq-question",
      ".faq-answer",
      "[itemprop=\"acceptedAnswer\"]"
    ]
  },
  "mainEntity": [
    {
      "name": "When should bathroom trim be installed during a renovation?",
      "@type": "Question",
      "acceptedAnswer": {
        "text": "Bathroom trim, such as baseboards, crown molding, and window/door casings, is typically installed towards the end of a renovation project. This usually occurs after walls are painted, flooring is laid, and fixtures are in place but before final touch-ups. Installing trim at this stage prevents damage during other construction activities and allows for a clean finish against new surfaces. This sequence helps protect the trim and ensures a precise fit.",
        "@type": "Answer",
        "description": "Bathroom trim is typically installed towards the end of a renovation, after painting and flooring but before final touch-ups."
      }
    }
  ],
  "description": "Bathroom trim is typically installed towards the end of a renovation, after painting and flooring but before final touch-ups."
}